Thermo Scientific Dionex UltiMate 3000 Series Operating Instructions Manual page 32

Solvent racks
Hide thumbs Also See for Dionex UltiMate 3000 Series:
Table of Contents

Advertisement

UltiMate 3000 Series:
SRD-3x00 Solvent Racks
When replacing a solvent supply line, remove the filter holder, then the retaining guide,
and then the solvent supply line.
7. Connect the lines to the appropriate connection ports on the degassing module. Route
the solvent supply lines through the opening between the housing and the front panel
door.
8. Remove the fitting plugs from the degasser inlet if necessary and connect the solvent
supply line with the associated line label.
Fig. 9: Example for degasser connections (here SRD-3600)
Tip: The degasser ports in the upper row are combined in pairs with the related
ports in the lower row.
Before connecting the solvent supply lines, make sure that the connectors are free of
contaminants. Even minute particles can allow air to enter the degasser, and thus reduce
the degassing effectiveness.
9. Connect the solvent supply lines from the pump to the degasser (→ page 27).
Page 26
Fig. 8: Opening for the solvent supply lines
A
B
C
A
B
Degasser inlets
(solvent supply line
C
Degasser outlets
(to pump)
Tubing guides
Operating Instructions

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Srd-3x00 seriesSrd-3600Srd-3400Srd-3200

Table of Contents