Installation; Precautions For Installation - Toshiba LQ500 Operation Manual

Density meter
Hide thumbs Also See for LQ500:
Table of Contents

Advertisement

6 F 8 A 0 5 2 1

3. INSTALLATION

3.1 Precautions for Installation

■The meter is heavy. To move
the meter for relocation or
installation, a qualified operator
must handle it by using
equipment such as a truck, a
DO
crane or a sling.
In addition, when you lift the meter
with its lifting bolts, make sure the
bolts have been securely
tightened to the end.
Overturning or dropping can cause
injuries or equipment failure.
Avoid installing the meter in
any of the following places:
Otherwise, a fire or equipment
breakdown or failure can occur.
DON'T
l Dusty place
l Place where corrosive gases
(SO
, H
2
may be generated.
l Place exposed to vibration or
shock that exceeds permissible
level.
l Place exposed to condensation
due to abrupt change in
temperature.
l Place too cold or hot for
installation
l Place too humid for installation
l Near an apparatus that generates
strong radio waves or strong
magnetic field.
WARNING
CAUTION
S) or flammable gases
2
 16 
■Do not operate where there is
a possibility of leakage of
flammable or explosive gas.
A fire or explosion can occur.
DON'T
Install the meter in a place
easier for operation,
maintenance and inspection.
In addition, when you place the
meter temporarily in a stocking
DO
area, make sure to execute fall
prevention measures.
Stumbling over the meter or a fall
of the meter can cause injury.
RF section
Applicator
Cure sheet
Detector
Roll-over
prevention
stopper

Advertisement

Table of Contents
loading

Table of Contents