Loading/Unloading; Lifting; Tie Downs/Lifting Points; Center Of Gravity - Skyjack SJ 7135 Operating Manual

Mid-size & full-size rough terrain series
Table of Contents

Advertisement

Section 3 - Operation

3.10 Loading/Unloading

Know and heed all national, state or territorial/provincial
and local rules which apply to your loading/unloading
of aerial platforms.
Only qualified personnel shall operate machinery
during loading/unloading.
Be sure vehicle capacity and loading equipment
hoists, chains, straps, etc., are sufficient to withstand
maximum aerial platform weight.
The transport vehicle must be parked on a level surface
and must be secured to prevent rolling while aerial
platform is being loaded/unloaded.
Tie down/lifting points
Center of
gravity
Mid Size & Full Size RTs
Engine Powered

3.10-1 Lifting

When it is necessary to lift the aerial platform the
following conditions must be met:
• The platform must be fully lowered.
• The main power disconnect switch must be in
• The hydraulic/electrical and fuel compartments
• The extension platform must be retracted and
• The platform control console must be secured to
• The platform must be cleared of all personnel,
• The lifting/rigging may be attached to all four lifting
Tie down/lifting points
Figure 3-9. Tie Downs/Lifting Points
Figure 3-10. Center of Gravity
WARNING
Only qualified rigger shall perform
lifting.
"
" off position.
must be closed and securely latched.
secured.
the railings or removed.
tools and materials.
points as illustrated in
Figure
Tie down/lifting points
Loading/Unloading
3-9.
Center of
gravity
Page 55