System Start Up And Shutdown; Start Up - GE Optima XR646 Operator's Manual

Digital radiographic system
Table of Contents

Advertisement

System Start Up and Shutdown

This section describes the procedure for starting up and shutting down the system.
The system should remain on at all times for optimal performance. However, a controlled system shut
down and start up should be performed once a week as part of routine QAP. Refer to
Assurance and Maintenance
If the receptor loses power for 30 minutes or more, reset the system and warm the receptor with active
power in "on" state for at least 30 minutes. Refer to
information.

Start Up

1. Press the Power On button on the RCIM [Radiology Control Interface Module].
Figure 4-1 Power button on RCIM
2. Wait a few minutes until the entire system is powered.
 The system powers up automatically.
 If enabled, the Login screen appears on the monitor when the system is ready. Refer to
Log off (p. 4-4)
for more information.
 If Login is not enabled, the Worklist appears on the monitor when the system is ready. Refer to
Chapter 9: Worklist
3. Wait for the detector to boot. This takes approximately 30 seconds.
 A message in the system status area will appear: "Detector Boot is in progress. Please wait 29 sec-
onds for the detector boot to complete."
 The system is ready when the detector boot message disappears.
5495975-1EN Rev.9
© 2013-2017 General Electric Company. All rights reserved.
for more information.
for more information.
System Emergency OFF Buttons (p. 4-10)
Chapter 4: General Information
Chapter 14: Quality
for more
Login and
4-2

Advertisement

Table of Contents
loading

Table of Contents