Installation instructions
3.4 Installation
3.4.1 Preparing for the installation
3.4.2 Positioning the machine
Check that there is sufficient room for the machine at the installation location.
•
Check that correct connections are available for water, electricity, drainage
and possibly steam at the installation location. See TECHNICAL SPECIFI-
CATIONS.
•
Check that the overheating protection device is reset.
Check the following points before the machine is placed in position:
•
Check that the fuse for the machine at the site is off, blocked and that out-
going electrical circuits from the machine are non-live.
•
Remove the protective plastic on the sides which are to be stood against a
wall.
•
The distance between the wall and machine should be at least 20 mm.
•
If the machine is to be corner-loaded, it must be positioned with the control
panel furthest away from the wall.
Place the machine in position and check that it, and any accessories, are horizon-
tally level. Adjust the height with the legs.
Check with a spirit level that is standing level. Place the spirit level on the join be-
tween the machine tank and the upper part. Once the machine has been filled
with water, do another check to make sure the machine is standing level.
WD-6
11
Rev. 6.0 (201902)