Installation
4.5 Connections of transport units
①
②
1. Position the first transport unit at the intended location.
2. Remove the protective caps.
3. Push the pipe couplings
4. Position the next transport unit in the line-up at the intended location. Carefully insert the
ends of the pipes into the protruding pipe couplings.
Note
Ensure that the cabinets are completely lined up and are at the same level. This may require
leveling, example, using shims. Ensure that the water pipes line up axially.
5. Push the pipe couplings over the pipe joints.
6. Tighten the hexagon socket-head screw
4.5.2
Connecting the converter system with the cooling unit
Connect the collecting pipes of the system to the cooling unit. Proceed in the same way as
described in Section "Connecting collecting pipes of the cooling circuit".
68
Pipe coupling
Pipe ends
①
Hexagon socket-head screw of the pipe coupling
①
provided loosely over the ends of the collecting pipes
①
with the torque specified on the pipe coupling.
Applications for Cabinet Modules, liquid cooled
Operating Instructions, 04/2015, A5E35974555A
②
.