Checklists and forms
C.1

Mechanical installation: Checklist

Use the following checklist to guide you through the mechanical installation procedure for the
cabinet/transport unit. Read the chapter titled "Safety instructions" before you start working on
the unit.
For information on performing the installation, refer to the following chapter "Installation" or the
documents listed in the following table.
Note
Checking the checklist
If the option in question is part of the delivery, check this accordingly in the right-hand column.
Check the boxes once you have finished the installation procedure to confirm that the activities
are complete.
Table C-1
Mechanical installation: Checklist
Item
Activity
1
Remove the transport indicators prior to installation.
(Chapter, "Preparations for use")
2
Check the adhesive label for the cabinet center gravity
3
The ambient conditions must be permissible. Additional data is provided in "Technical
data".
4
The load-carrying capacity and properties of the ground must meet the requirements for
installation of the unit. Additional data is provided in "Technical data".
5
The crane transport equipment attached must be removed once the transport unit or
individual cabinet units have been set down at the final installation location.
(Chapter "Attaching/removing the crane transport equipment)
6
Before the cabinet units are finally installed, the wooden pallets supplied with the trans‐
port unit must be removed properly.
(Chapter "Preparations for use/Unpacking/Lifting the cabinet units off the transport pallet
and installing the cabinet units")
7
The minimum ceiling height (for unobstructed air outlet) must be observed. The cooling
air supply and exhaust must not be obstructed and must be available in sufficient quan‐
tity.
(Chapter "Preparations for use/requirements regarding the installation site".
8
The cabinet must be firmly attached to the fixing points provided.
Correctly establish the connections when installing the cabinet units side-by-side.
(Chapter "Installation/connection for side-by-side installation of cabinet units")
Siemens Drives & PLCs
Applications for Cabinet Modules, liquid cooled
Operating Instructions, 04/2015, A5E35974555A
C
Applicable?/Completed?
145