Fastening The Cable Ducts With Cable Ties; Cable Routing; Basic Rules For Cable Routing - Siemens SINAMICS S120 Operating Instructions Manual

Applications for cabinet modules, liquid-cooled
Hide thumbs Also See for SINAMICS S120:
Table of Contents

Advertisement

Electrical connection

5.4 Cable routing

5.3.8

Fastening the cable ducts with cable ties

Fasten all cable ducts whose cover faces downward with cable ties. Wind the cable ties around
the entire cable duct. The cable ties must be located at the same positions as in the delivered
state.
Figure 5-4
5.4
Cable routing
5.4.1

Basic rules for cable routing

Hazardous electrical voltage
The work described in this section is carried out in cabinets that are operated in industrial
high-voltage installations. During operation, this cabinet contains live parts at high voltages
and rotating parts. Fatal or severe injuries and substantial material damage can occur if the
required covers are inadmissibly removed or when incorrectly used, incorrectly operated or
inadequately maintained.
Read and observe the safety and application notes.
Ensure, before starting work – for all cable routing and connection work in the Cabinet
Applications – the following:
● Bring the cabinet unit into a no-voltage condition.
● Comply with the "five safety rules".
● Facilitate free access to the required components in the Cabinet Modules. If necessary,
remove the covers.
86
Fastening the cable ties
DANGER
Applications for Cabinet Modules, liquid cooled
Operating Instructions, 04/2015, A5E35974555A

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents