6 Checklist
6.1 Installation site
We recommend performing an inspection of the circumstances on location at least 4 weeks prior to installation. The
checklist should help you when doing this.
This can help ensure a smooth procedure on the day that the SINIUS is actually installed.
Installation location:
● Installation location:
● Unit location:
● Building number:
● Room name/number:
52
6
Checklist
6.1
Installation site
Sirona Dental Systems GmbH
Installation Requirements SINIUS / SINIUS CS / SINIUS TS
D3561.021.01.06.02 12.2014
63 22 668 D3561