Incoming Inspection
WFM5200 Waveform Monitor Specifications and Performance Verification
This section contains functional/operational checks appropriate to an incoming
inspection.
The waveform monitor must have been operating for a warm-up period of at least
20 minutes. (See Table 31 on page 17.)
Use the following procedures to check the basic functionality of WFM5200
Waveform Monitor. The checks are arranged by model and option so that you can
choose the sections that are appropriate for your instrument. The last two sections
are for less critical waveform monitor features: the ground closure and Ethernet
ports. You need only test these if you intend to use them. In general, you should
test in the order presented, since later tests might depend on items checked in the
earlier tests.
Incoming Inspection
29
Need help?
Do you have a question about the WFM5200 and is the answer not in the manual?
Questions and answers