Stopping And Shutdown - Flowserve VTP User Instructions

Table of Contents

Advertisement

VERTICA
5.8.4
Pum
mp and moto
If the p
pumps are wo
orking in a po
explosive atm
mosphere, te
monitoring a
at the bearings
s is recomme
If pump bear
ring temperat
bearings) are
e to be monito
benchmark t
temperature is
commissioni
ng stage and
d after the bea
temperature
has stabilize
Record t
the bearing te
emperature (t
ambient
temperature
Estimate
e the likely ma
aximum ambi
tempera
ture (tb)
Set the a
alarm at (t+tb
trip at 100 C
C (212 F) for
and the t
C (220 F) f
and 105
for grease lub
It is importan
nt, particularly
y with grease
keep a close
e watch on the
e bearing tem
After startup
the temperat
ture rise shou
reaching a m
maximum afte
hours. This
temperature
constant or m
marginally red
duce with time
5.8.5
Mult
tiple Can Pum
mp Operatio
Additional pr
rocedures ma
ay be required
can pump sy
ystems when
idle. Contact
t Flowserve fo
or details.
5.9
Stopp
ping and S
Shutdown
a) Close th
e outlet valve
e, but ensure
runs in th
his condition
seconds
s.
b) Stop the
e pump.
c) Switch o
off flushing an
supplies
at a time app
propriate to th
For prolon
nged shutdow
especially w
hen ambient
drop below f
freezing point
and flushing
arrangement
ts must be dra
otherwise pr
rotected.
5.10
Hydr
aulic, mec
chanical an
dut
y
This product
t has been su
performance
e specification
ns of your pur
however it is
s understood t
product thes
se may chang
help the use
r decide how
Page 46 of 7
76
AL TURBINE
E PUMPS (VT
r bearing tem
mperature
tentially
mperature or
vibration
ended.
ures (such as
s thrust
ored it is esse
ential that a
s recorded at
t the
aring
d.
) and the
(ta)
ent
-ta+5) C [(t+
tb-ta+10) F]
oil lubrication
n
brication
lubrication, to
mperatures.
uld be gradua
r approximate
ely 1.5 to 2
rise should th
hen remain
e.
on
d in multiple
one or more
pump remain
ns
that the pump
for no more t
han a few
d/or cooling/h
heating liquid
he process.
wns and
temperatures
s are likely to
, the pump an
nd any coolin
ained or
nd electrica
pplied to mee
et the
rchase order,
that during th
e life of the
e. The follow
wing notes ma
to evaluate t
he implication
TPS) CENTRI
IFUGAL PUM
of any
change. If in
Flowse
erve office.
5.10.1
Specific gr
Pump
capacity and
change
e with SG, ho
pressu
ure gauge is d
absorb
bed is also dir
therefo
ore important
will not
t overload the
the pu
mp.
5.10.2
Viscosity
For a g
given flow rat
increas
sed viscosity
viscos
ity. Also for a
absorb
bed increases
reduce
es with reduce
checks
s are made w
if chan
nges in viscos
o
5.10.3
Pump spee
l,
Chang
ging pump spe
absorb
bed, NPSH
, n
R
direct p
proportion to p
ratio sq
quared and po
The ne
ew duty, howe
system
m curve. If incr
therefo
ore to ensure t
pressu
ure is not exce
NPSH
> NPSH
, an
A
A
R
within l
local requirem
5.10.4
Net positiv
NPSH
available (NP
p
availab
ble in the pum
pressu
ure, at the pum
NPSH
required (NPS
require
ed in the pump
pressu
ure, to prevent
importa
ant that NPSH
NPSH
> NPSH
sh
A
A
R
change
e in NPSH
A
are no
ot significantly
g
perform
mance curve
particu
ularly if flow h
If in do
oubt please co
al
office f
for advice and
margin
n for your app
5.10.5
Pumped flo
Flow m
must not fall o
ay
maxim
mum continuou
ns
perform
mance curve
MPS ENGLIS
SH 71569224
n doubt conta
ct your neare
ravity (SG)
total head in
metres (feet)
owever pressu
ure displayed
directly propo
rtional to SG.
rectly proport
ional to SG.
to check that
t any change
e pump driver
r or over-pres
te the total he
ead reduces w
and increase
es with reduce
a given flow r
ate the powe
s with increas
sed viscosity,
ed viscosity.
It is importan
with your near
est Flowserve
sity are planne
ed.
ed
eed effects flow
w, total head,
noise and vibra
ation. Flow va
pump speed, h
head varies as
ower varies as
s speed ratio c
ever, will also b
be dependent
reasing the sp
peed, it is impo
the maximum
pump working
eeded, the driv
ver is not overl
nd that noise a
and vibration a
ments and regu
ulations.
ve suction he
ead (NPSH
PSH
) is a me
easure of the
A
mped liquid, a
above its vapo
mp suction br
ranch.
SH
) is a mea
asure of the he
R
ped liquid, abo
ove its vapour
t the pump from
m cavitating.
H
> NPSH
. T
The margin be
A
R
ould be as lar
rge as possible
is
s proposed, e
ensure these
y eroded. Ref
fer to the pum
to determine
exact require
as changed.
onsult your ne
earest Flowse
d details of th
he minimum a
plication.
ow
outside the mi
inimum and
us safe flow s
shown on the
and or data s
sheet.
flowse
4 – 02-15
est
) do not
d on a
. Power
It is
in SG
ssurize
with
ed
r
and
nt that
e office
power
aries in
s speed
cubed.
t on the
ortant
g
loaded,
are
)
A
head
our
ead
It is
etween
e. If any
margins
mp
ements
erve
allowable
pump
erve.com

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Vpc

Table of Contents