Commissioning, Startup, Operation And Shutdown; Pre-Commissioning Procedure; Pump Lubricants - Flowserve VTP User Instructions

Table of Contents

Advertisement

VERTICA
5
COMM
MISSIONIN
OPER
RATION AN
ND SHUTDO
These ope
by fully quali
fied personne
safety while
pump commi
5.1
Pre-c
commissio
oning Proce
The gland is
to be filled w
with grease an
to be in place
e. Flush pipin
Mechanical s
seals to be ch
and pressure
e.
a) Pumps w
with the enclos
bearings
s must be filled
avoid run
nning dry and
performa
ance of the pu
ump. A separa
attached
to the pump
b) For can p
pumps check
complete
e filling of the p
procedur
re can take fro
dependin
ng on the kind
d of fluid .
c) Check th
he direction of
(Coupling
g spacer dism
mantled). Sho
clockwise
e when viewe
ed from the dri
d) The pum
mp rotor and th
he shaft seal m
correct a
axial position.
e) Check th
he readiness o
sys., lubr
rication system
f)
All pipe w
work, including
auxiliary
pipe work, mu
and mus
st be absolutel
of all con
nnections of th
he auxiliary pip
suction v
valve must be
shall be c
closed or part
g) Turn the
pump by han
nd, if required w
a lever, t
to check the fr
rotor mus
st turn uniform
mly and noisel
resistanc
ce may be felt
bearings
s and seals.
h) Check th
he readiness o
to the ma
anual for the d
precautio
ons are in plac
Page 35 of 7
76
AL TURBINE
E PUMPS (VT
G, STARTU
UP,
OWN
erations must
be carried ou
el. Turn off po
ower supply f
ssioning is in
progress.
edure
nd flush suppl
ng to be chec
cked for leaks
hecked for lea
aks, flush flow
sing tubes and
d oil-lubed
d with the prop
per lubricant to
to guarantee
acceptable
ate oil tank is
(see detail in
section 5.2.2)
all vent conne
ections for
pump. The ve
enting
om 10 minutes
s up to 2 hour
f rotation of the
e pump
uld be counte
ver end.
must be in
of all auxiliary
systems (sea
m etc.,) for sta
artup.
g the internal
and the
ust be connec
cted correctly
ly tight. Chec
k the tightnes
pe work. The
open, the dis
charge valve
tially open as
required.
with the help o
ree rotation of
f the rotor. Th
essly. Some
t due to the fric
ction in the
of the driver fo
or startup. Ref
driver to be su
ure that all
ce to energize
e the motor.
TPS) CENTRI
IFUGAL PUM
5.2
P
Pump Lub
Other t
than the stuff
seal an
nd/or lineshaf
ut
require
e further perio
for
the suc
ction bearing
repack
ked when req
hydroc
carbons or ha
Teflon
suction bear
bearing
gs packed. If
y
longer
storage perio
s.
flushed
d and cleaned
w
agent.
It is not nece
for sho
ort or long-ter
thorou
ghly with the
o
Re-check
be in a
accordance w
).
instruc
ctions supplied
5.2.1
Open lines
rs,
Open l
ineshaft bear
fluid wh
here the static
below t
the discharge
er
pre or
post-lubricatio
that the
e gland or sea
flush flo
ow.
al
All ope
en lineshaft pu
more th
han 9 m (30 f
be ade
equately pre-lu
s
5.2.1.1
1
Pre-lubric
Allow f
flush water to
minute
es for pumps o
pre-lub
be duration by
of
(15 ft)
additional sha
e
The fitt
tings for pre-l
head.
5.2.1.2
2
Typical p
fer
(example
In gene
eral all W typ
provide
ed with a stan
connec
ction. Fabrica
with a
special piping
liquid f
flow onto the
It is the re
reliable
e pre-lube sys
lubrica
ation. Flowser
system
ms or accesso
MPS ENGLIS
SH 71569224
ricants
fing box lubric
cation, mecha
ft lubrication,
the pump wil
odic lubricatio
on. On water
on the bowl a
assembly sho
uired. Pumps
s that pump
ave carbon, ru
ubber, epoxy
ings do not h
ave the suctio
f the pump w
ill be started a
od, the bearin
ngs should be
d by using a s
suitable clean
essary to rem
move the oil sp
m storage as
s this will mix u
lubrication oi
l.
king the motor
r lubrication s
with the motor
manufacture
d separately w
with the pum
shaft lubricat
tion
rings are lubric
cated by the p
c water level i
is less than 9
e head and wi
ll usually not r
on. Care is to
o be taken to e
al is supplied
with the requi
umps where th
he static wate
ft) below the d
discharge hea
ubricated befo
ore starting th
cation durati
ion
o flow down th
he shaft for 45
over 9 m (30
ft) and increa
y at least 15 m
minutes for ev
aft length bey
yond 20 m (65
lube are prov
ided at the di
pre-lube pipe
e connection
es (a) thru (d)
))
e cast discha
arge heads ar
ndard size pip
pe fitting for p
ated discharg
ge heads are
g arrangemen
nt to allow pre
shaft.
esponsibility of
f the user to in
stem to achiev
ve the pump p
rve will not su
pply these typ
ories with the p
pump.
flowse
4 – 02-15
anical
l not
pumps,
ould be
or
on
after a
e first
ning
prayed
up
should
er's user
p.
pumped
m (30 ft)
require
ensure
ired
er level is
ad should
e pump.
5
ase the
very 5 m
5 ft).
scharge
re
pre-lube
fitted
e-lube
nstall a
pre-
pes of
erve.com

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Vpc

Table of Contents