Sign In
Upload
Download
Table of Contents
Contents
Add to my manuals
Delete from my manuals
Share
URL of this page:
HTML Link:
Bookmark this page
Add
Manual will be automatically added to "My Manuals"
Print this page
×
Bookmark added
×
Added to my manuals
Manuals
Brands
Flowserve Manuals
Water Pump
VTP
User instructions
Performance And Operation Limits; Installation; Location; Preparation - Flowserve VTP User Instructions
Hide thumbs
1
Table Of Contents
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
51
52
53
54
55
56
57
58
59
60
61
62
63
64
65
66
67
68
69
70
71
72
73
74
75
76
page
of
76
Go
/
76
Contents
Table of Contents
Bookmarks
Table of Contents
Advertisement
VERTICA
3.3.8
Acc
essories
Accessories
may be fitted
d when specif
customer.
3.4
Perfo
ormance an
This product
has been sele
specifications
s of the purcha
The following
g data is includ
help with the
installation. It
temperature,
materials and
data. If requi
red, a definitive
application ca
an be obtained
d from Flowser
3.4.1
Ope
erating limits
Pumped liquid
d temperature
limits*
Maximum amb
bient
temperature*
Maximum pum
mp speed
*Subject to w
written agreem
Special desig
gns and mate
pumps opera
ating above a
and below the
limits. Conta
act Flowserve
e for upgrade
available for
your specific
c application.
4
INSTA
ALLATION
Equipm
ment operated
must comply
y with the rele
evant explosio
regulations.
See section
potentially ex
xplosive atmo
4.1
Loca
tion
When equipm
ment has been
months, a co
omplete inspec
accordance w
with section 2.
located to allo
ow room for a
maintenance
e and inspectio
on with ample
lifting and sho
ould be as clo
ose as practica
supply of liqu
uid to be pump
ped. Refer to t
arrangement
t drawing for th
4.1.1
Insp
pection prior
Six months p
prior to the sch
Flowserve P
ump Division
employed to
conduct an in
and the facili
ty. If any dete
noticed, the F
Flowserve Pu
may require
a partial or co
omplete disma
equipment in
ncluding resto
some compo
onents.
Page 21 of 7
76
AL TURBINE
E PUMPS (VT
fied by the
nd Operati
ion Limits
ected to meet
the
ase order. Se
ee section 1.5.
ed as addition
nal information
is typical and
factors such a
seal type may
y influence this
e statement fo
or your particul
rve.
5 ºC (40 ºF) to +
+80 ºC (176 ºF)
Up to +40 ºC (10
04 ºF)
refer to the nam
meplate
ment from Flo
owserve.
erials may be
available for
se specified
options
d in hazardou
us locations
on protection
1.6.4, Produc
cts used in
ospheres.
n in storage fo
or greater than
ction should be
e conducted in
.4.3. The pum
p should be
ccess, ventila
tion,
headroom for
able to the
the general
he pump set.
to installatio
on
heduled instal
llation date, a
representativ
e is to be
nspection of th
he equipment
erioration of e
equipment is
mp Division r
representative
antling of the
ration and rep
placement of
TPS) CENTRI
IFUGAL PUM
4.2
Preparatio
P
The pu
ump should be
ventilat
tion, maintena
headro
oom for lifting a
practic
cable to the su
Refer t
to the general
to
dimens
sions and deta
as
s
4.2.1
General ins
ar
The fo
ollowing check
actual
installation.
a) Ma
ake sure that
po
ower supply sy
b) Ch
heck the sum
up
p.
c) Ch
heck the liquid
d) Ch
heck the insta
wil
ll safely hand
e) Ch
heck all pump
an
ny shipping an
Alwa
three p
places when l
should
d be attempted
necess
sary for a suc
On
n hollow shaft
ag
gainst the sha
clu
utch
On
n solid shaft d
n 6
ag
gainst the cou
n
App
r
male s
shaft threads
shaft c
connection. E
avoide
ed.
Alwa
connec
cting driver to
improp
per motor dire
to the p
pump.
e
4.3
F
Foundatio
The
pump
units to their
depend
ds on the size
vibratio
on limitations
MPS ENGLIS
SH 71569224
on
e located to al
low room for a
ance and insp
ection with am
and should be
e as close as
pply of liquid t
to be pumped
arrangement
drawing for th
ails.
stallation ch
heck-list
ks should be
made before
motor namep
plate ratings a
ystem match
correctly.
p depth and p
pump length m
d level in the
sump.
allation equipm
ment to be su
dle the pump w
weight and si
p connections
s (bolts, nuts e
nd handling re
elated problem
ays support s
shafting in at l
lifting or insta
alling. No inst
d without adeq
quate equipm
cessful install
lation.
t drivers, chec
ck the clutch
aft size, which
h must go thro
drivers, check
k the motor sh
upling bore siz
ze
ly thread lubr
ricant sparing
only at the tim
me of making
Excess lubrica
ant should be
ays check mo
otor rotation be
o pump. Rese
erve rotation d
ection can cau
use extensive
n/Anchor B
Bolts
re are many m
methods of in
foundations.
The correct m
e of the pump
p unit, its loca
. Non-compl
iance with the
flowse
4 – 02-15
access,
mple
.
he pump
starting
and the
match-
ure that it
ze.
etc) for
ms.
least
tallation
ment
size
ough the
haft size
ly to
up
e
efore
due to
damage
nstalling
method
ation and
e
erve.com
Table of
Contents
Previous
Page
Next
Page
1
...
18
19
20
21
22
23
24
25
Show Quick Links
Quick Links:
Maintenance
Disassembly
Drawings and Parts Lists
Hide quick links:
Permanently
Temporary
Cancel
Advertisement
Table of Contents
Need help?
Do you have a question about the VTP and is the answer not in the manual?
Ask a question
Go to Questions and Answers
Related Manuals for Flowserve VTP
Water Pump Flowserve Flowserve 71576286 User Instructions
Installation operation maintenance multi-stage, single suction and radial joint plan pump type centrifugal pump (35 pages)
Water Pump Flowserve Centrifugal Pump 8-UB-1 Installation & Operation Instruction
Centrifugal pump (32 pages)
Water Pump Flowserve Centrifugal Pump MHP-TN User Instructions
Centrifugal pump installation operation maintenance (28 pages)
Water Pump Flowserve FM Centrifugal Pump PCN=71576526 User Instructions
Fm centrifugal pump multi-stage, centrifugal close-coupled pump with an axial suction and a vertical axis discharge installation operation maintenance (32 pages)
Water Pump Flowserve CPX User Instructions
Single stage, end suction, centrifugal, chemical process pumps (44 pages)
Water Pump Flowserve Durco Mark 3 Installation, Operation & Maintenance Manual
Standard two piece bearing frame foot mounted, centreline mounted and unitized self-priming chemical process pumps (52 pages)
Water Pump Flowserve DMX User Instructions
Multistage, single/double suction, horizontally split volute type centrifugal pumps (26 pages)
Water Pump Flowserve R User Instructions
Centrifugal rubber lined slurry pump (56 pages)
Water Pump Flowserve PVML 25.04.04 User Instructions
Centrifugal pumps (29 pages)
Water Pump Flowserve HDX Series User Instructions
Centrifugal pumps (60 pages)
Water Pump Flowserve HPX Instructions For Installation, Operation And Maintenance
Centrifugal pumps (61 pages)
Water Pump Flowserve M Series User Instructions
Slurry pump (60 pages)
Water Pump Flowserve Mark 3 User Instructions
High silicon iron pumps (48 pages)
Water Pump Flowserve SVCN 7 Installation Operation & Maintenance
(62 pages)
Water Pump Flowserve FRBH User Instructions
Centrifugal paper stock and process pumps (60 pages)
Water Pump Flowserve SIHI dry Standard M Series Instruction & Operation Manual
Dry running vacuum pump (82 pages)
Related Content for Flowserve VTP
Mark 3 Performance And Operation Limits
Flowserve Mark 3
This manual is also suitable for:
Vpc
Table of Contents
Save PDF
Print
Rename the bookmark
Delete bookmark?
Delete from my manuals?
Login
Sign In
OR
Sign in with Facebook
Sign in with Google
Upload manual
Upload from disk
Upload from URL
Need help?
Do you have a question about the VTP and is the answer not in the manual?