Electrical Connections; Final Shaft Alignment Check; Protection Systems - Flowserve VTP User Instructions

Table of Contents

Advertisement

VERTICA
4.7.3
Aux
xiliary piping
4.7.3.1
Dr
rains
Normal pum
p leaks and g
gland leakage
through a se
eparate piping
g arrangemen
the suction/s
sump.
4.7.3.2
Pu
umps fitted w
with gland pa
The pumped
d liquid is allow
gland packin
ng at discharg
ge pressure a
of the pump
or re-circulate
separate flus
sh supply may
cases. The
piping plans a
selected bas
sed on the ap
parameters.
In some spe
cial cases wh
here the disch
exceeds 6.5
bar (100 psi)
recommende
ed.
4.7.3.3
Pu
umps fitted w
with mechani
Auxiliary pip
ing to circulat
into the suct
ion is required
source requi
rements for p
pump applicat
high tempera
ature service,
oxidizing flui
ds, a special
clean liquid i
nto the seal c
pressure is r
required and s
available to s
suit the speci
See sectio
on 5.4 for Dire
rotation befo
ore connecting
4.7.4
Fina
al checks
After connec
cting the pipin
ng to the pum
shaft severa
l times by han
If pipe strain
exists, correc
4.8
Elect
trical Conn
nections
Electrical c
by a qualified
d Electrician i
local nationa
al and internat
It is im
mportant to be
DIRECTIVE
on potentially
compliance w
with IEC6007
79-14 is an ad
requirement
for making e
It is im
portant to be
DIRECTIVE
on electroma
agnetic compa
wiring up and
d installing eq
must be paid
d to ensure th
hat the techniq
during wiring
g/installation d
electromagn
etic emission
ns or decrease
electromagn
etic immunity
y of the equip
Page 34 of 7
76
AL TURBINE
E PUMPS (VT
e to be draine
nt or back into
acking
wed to flow th
hrough the
nd drained ou
ed back into t
the suction. A
y be required
in some
and flush sup
pply are to be
plication and
operating
harge pressur
) a special flus
shing plan is
ical seals
te the flushing
g liquid back
d. In case of
external clea
tions such as
, contaminate
ed fluids,
piping plan to
o carry the
chamber with
adequate
several piping
g plans are
fic pump app
lication.
ection of
g motor to the
e power supp
p, rotate the
nd to ensure
no pipe strain
ct piping.
onnections m
must be made
in accordance
e with relevan
tional regulat
ions.
aware of the
e EUROPEAN
y explosive ar
reas where
dditional
lectrical conn
ections.
aware of the
EUROPEAN
atibility when
quipment on s
site. Attention
ques used
do not increas
se
e the
ment, wiring o
TPS) CENTRI
IFUGAL PUM
any co
onnected devi
Flowse
erve for advic
The m
d
accord
dance with the
o
instruc
ctions (norma
box) in
ncluding any t
current
t and other pr
The ide
entification na
ensure
e the power s
ut
A
A device to pr
A
be fitte
ed.
If not s
supplied pre-w
control
ller/starter ele
supplie
ed within the c
re
For ele
ectrical details
see the
e separate wi
See
before
connecting t
an
4.9
F
Final Shaft
After c
connecting pip
severa
al times by ha
and all
l parts are fre
alignm
ment, as previo
strain.
If pipe strain
4.10
P
Protection
ly.
The following
T
recomm
mended parti
potenti
ially explosive
liquid.
If in doubt, c
n.
If there
e is any possi
pump t
to run agains
minimu
um continuou
should
d be installed
liquid d
does not rise
nt
If there
e are any circ
can all
ow the pump
N
power
monitor shou
preven
nt it from bein
relevan
nt if the pump
If leaka
age of produc
sealing
g system can
recomm
mended that
n
system
m is installed.
To prev
vent excessiv
bearing
gs, it is recom
vibratio
on monitoring
or
MPS ENGLIS
SH 71569224
ices. If in any
y doubt conta
ce.
motor must be
e wired up in
e motor manu
ufacturer's
lly supplied w
within the term
temperature,
earth leakage
rotective devi
ices as appro
ameplate sho
ould be check
upply is appro
opriate.
rovide emerge
ency stopping
wired to the p
pump unit, the
ectrical details
s will also be
controller/sta
rter.
s on pump se
ets with contro
iring diagram
.
section 5.4,
Direction of r
he motor to th
he electrical s
t Alignmen
nt Check
ping to the pu
ump, rotate th
and to ensure
there is no b
ee. Recheck t
the coupling
ously describ
ed, to ensure
n exists, corre
ect piping.
n Systems
protection sy
ystems are
icularly if the
pump is insta
e area or is h
andling a haz
consult Flowse
erve.
ibility of the sy
ystem allowin
t a closed val
lve or below
us safe flow a
protection de
to ensure the
e temperature
to an unsafe
level.
cumstances in
n which the sy
p to run dry, o
r start up emp
uld be fitted to
o stop the pum
g started. Th
his is particula
p is handling a
a flammable l
ct from the pu
ump or its ass
cause a haza
ard it is
an appropria
te leakage de
ve surface tem
mperatures at
mmended tha
t temperature
g is done on a
a regular basi
flowse
4 – 02-15
act
minal
e,
opriate.
ked to
g must
e
ollers
rotation
supply.
e shaft
inding
e no pipe
alled in a
zardous
ng the
evice
e of the
ystem
pty, a
mp or
arly
liquid.
sociated
etection
t the
e and/or
s.
erve.com

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Vpc

Table of Contents