Sign In
Upload
Download
Table of Contents
Contents
Add to my manuals
Delete from my manuals
Share
URL of this page:
HTML Link:
Bookmark this page
Add
Manual will be automatically added to "My Manuals"
Print this page
×
Bookmark added
×
Added to my manuals
Manuals
Brands
Flowserve Manuals
Water Pump
VTP
User instructions
Flowserve VTP User Instructions page 43
Hide thumbs
1
Table Of Contents
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
51
52
53
54
55
56
57
58
59
60
61
62
63
64
65
66
67
68
69
70
71
72
73
74
75
76
page
of
76
Go
/
76
Contents
Table of Contents
Bookmarks
Table of Contents
Advertisement
VERTICA
5.7.1.1
Ty
ypical safety
After initia
al startup, pre
the mechani
cal seal will u
usually not be
enough liquid
d will remain
subsequent
startup lubric
A s
screen guard
having a two
o-piece heads
shaft or an ad
flanged coup
pling. This sc
creen must be
place prior to
o pump startu
up to prevent
contact with
rotating parts
s. Typical arr
shown in sec
ction 5.7.1.1.
5.7.2
Stuf
ffing box adj
On the initial
starting it is v
very important
packing not b
be tightened e
excessively. N
must be run
in properly to
and shortenin
ng of the pack
king life.
The stuffing b
box must be a
allowed to lea
operation. T
The proper am
mount of leaka
determined b
by checking th
he temperatur
leakage, this
should be co
ool or just luke
HOT - usuall
y 40 to 60 dro
ops per minute
adequate.
When adjust
ing the packin
ng gland, bring
down evenly
and in small
reduced as r
equired. The
Page 43 of 7
76
AL TURBINE
E PUMPS (VT
guards
G
UARDS
INS
STALLED
e-lubrication o
of
required as
in the seal ch
hamber for
ation.
is furnished w
with all pump
justable
e secured in
possible
angement is
ustment
t that the
New packing
prevent dama
age to the sha
k for proper
ge can be
re of the
ewarm - NOT
e will be
g both nuts
steps until the
e leakage is
nuts should o
only be
TPS) CENTRI
IFUGAL PUM
tighten
ned about one
minute
e intervals to a
Under
proper opera
time. O
Occasionally a
be add
ded to keep th
After a
adding two or t
proper
r adjustment c
box sh
hould be clean
and re-
-packed.
5.7.3
Open shaft
Open l
lineshaft bear
pumpe
ed fluid on sho
(50 ft)
long and usu
lubrica
ation. All ope
water l
level is more
discha
arge head sho
before
e startup. The
reverse
e ratchet on t
when t
turning off pu
lubrica
ation is also n
5.7.4
Enclosed s
Enclos
sed lineshaft b
extrane
eous liquid (u
The oi
l reservoir mu
quality
y of light turbin
operat
ting temperatu
drops/
minute for ev
Injectio
on systems a
s
Injectio
on pressure a
will var
ry. Usually 0
0.7 to 0
0.14 bar (10 t
discha
arge pressure
For rec
commended o
lubrica
ation under no
see tab
bles 5.2.3.1 a
oils are
e available, oi
should
d be obtained.
aft
oxidati
on inhibitors a
2
to 37 c
cSt (mm
/sec)
viscosi
ity index of 90
In th
bearing
gs, the sourc
checke
ed against the
require
ements for an
supply
y pressure or
supply
y before pump
MPS ENGLIS
SH 71569224
e half turn at a
a time at 20 to
allow the pack
king to "run-in
ation, a packin
ng set will last
a new ring of
packing will n
he box full.
three rings of
f packing, or w
cannot be ach
hieved, the stu
ned completel
y of all old pa
ft lubrication
before start
rings are lubr
ricated by the
ort-coupled u
units less than
ually do not re
equire pre- or
n lineshaft pu
umps where th
than 15 m (5
0 ft) below th
ould be adequ
uately pre-lub
ese units shou
uld have a no
the driver to p
prevent backs
mp. If there i
is no NRR, po
ecessary.
shaft lubrica
ation before s
bearings are
lubricated by
usually oil or c
clean water
ust be kept fil
led with a goo
ne oil (about 3
30 cSt (mm
ure) and adju
usted to feed 3
very 30 m (10
0 ft) of colum
re designed f
for each insta
and quantity o
of lubricating l
3
.45 to 0.90 m
m
/h (2 to 4 gp
to 20 psi) ove
er maximum p
of clean liqui
id is required
oils for enclos
sed lineshaft b
ormal operatin
ng conditions,
nd 5.2.3.2. If
f none of the a
il with the follo
owing specific
Turbine type
e oil with rust
added, viscos
sity 30 cSt (mm
) at 40 C (100
0 F) with a m
0.
he case of pro
oduct-lubricat
ce of product s
supply should
e order. Ther
re may be
n external clea
an supply, pa
the commenc
cement of lub
p startup.
flowse
4 – 02-15
o 30
".
a long
need to
when
uffing
acking
tup
n 15 m
post-
he static
e
bricated
on-
spin
ost-
start up
an
od
2
/s
sec) at
3
n.
allation.
liquid
pm) at
pump
.
bearing
please
above
cations
and
2
m
/sec)
minimum
ed
d be
rticular
brication
erve.com
Table of
Contents
Previous
Page
Next
Page
1
...
40
41
42
43
44
45
46
47
Show Quick Links
Quick Links:
Maintenance
Disassembly
Drawings and Parts Lists
Hide quick links:
Permanently
Temporary
Cancel
Advertisement
Table of Contents
Need help?
Do you have a question about the VTP and is the answer not in the manual?
Ask a question
Go to Questions and Answers
Subscribe to Our Youtube Channel
Related Manuals for Flowserve VTP
Water Pump Flowserve Flowserve 71576286 User Instructions
Installation operation maintenance multi-stage, single suction and radial joint plan pump type centrifugal pump (35 pages)
Water Pump Flowserve Centrifugal Pump 8-UB-1 Installation & Operation Instruction
Centrifugal pump (32 pages)
Water Pump Flowserve Centrifugal Pump MHP-TN User Instructions
Centrifugal pump installation operation maintenance (28 pages)
Water Pump Flowserve FM Centrifugal Pump PCN=71576526 User Instructions
Fm centrifugal pump multi-stage, centrifugal close-coupled pump with an axial suction and a vertical axis discharge installation operation maintenance (32 pages)
Water Pump Flowserve CPX User Instructions
Single stage, end suction, centrifugal, chemical process pumps (44 pages)
Water Pump Flowserve 5LR-15D Manual
Jea west nassau high service pumps (115 pages)
Water Pump Flowserve DMX User Instructions
Multistage, single/double suction, horizontally split volute type centrifugal pumps (26 pages)
Water Pump Flowserve Durco Mark 3 Installation, Operation & Maintenance Manual
Standard two piece bearing frame foot mounted, centreline mounted and unitized self-priming chemical process pumps (52 pages)
Water Pump Flowserve HDX Series User Instructions
Centrifugal pumps (60 pages)
Water Pump Flowserve MSX Series User Instructions
Centrifugal pumps (30 pages)
Water Pump Flowserve SIHI dry Standard M Series Instruction & Operation Manual
Dry running vacuum pump (82 pages)
Water Pump Flowserve WDX R/C Installation, Operation, Maintenance Manual
Wdx centrifugal pumps (47 pages)
Water Pump Flowserve HWMA User Instructions
Centrifugal pumps (34 pages)
Water Pump Flowserve FRBH User Instructions
Centrifugal paper stock and process pumps (60 pages)
Water Pump Flowserve WORTHINGTON 200LNN300 User Instructions
Centrifugal pumps (24 pages)
Water Pump Flowserve Byron Jackson H2O+ User Instructions
Submersible water well pumps (55 pages)
This manual is also suitable for:
Vpc
Table of Contents
Save PDF
Print
Rename the bookmark
Delete bookmark?
Delete from my manuals?
Login
Sign In
OR
Sign in with Facebook
Sign in with Google
Upload manual
Upload from disk
Upload from URL
Need help?
Do you have a question about the VTP and is the answer not in the manual?