Lifting And Assembly - Flowserve VTP User Instructions

Table of Contents

Advertisement

VERTICA
Grouting pro
ovides solid co
unit and foun
ndation that p
prevents latera
running equi
pment and da
Care should
be taken to e
contact with
grout betwee
en the pump b
plate, suction
n can and fou
undation (no v
Foundatio
tightened aft
ter the grout h
Page 24 of 7
76
AL TURBINE
E PUMPS (VT
ontact betwee
en the pump
al movement
ampens reso
nant vibration
ensure maxim
mum surface
base, sole
voids).
n bolts should
d only be fully
has been cure
ed.
TPS) CENTRI
IFUGAL PUM
4.5
Lifting and
L
of
Motors
s may be sup
ns.
It is the
e responsibili
the mo
otor is assem
detaile
ed in section 4
piping
and the pum
separa
ately or as ful
pump s
size and weig
y
separa
ately, it is the
and ali
ign the pump
Flowse
erve's installa
4.5.1
Installation
unassemb
4.5.1.1
1
Lifting
See lift
fting methods
4.5.1.2
2
Equipme
installatio
The fo
llowing list co
require
ed for installat
a) Tw
wo (2) mobile
low
wering the pum
b) Tw
wo (2) steel cla
c) Tw
wo (2) sets of
att
taching to the
d) Pip
pe clamp for l
co
olumn pipe. A
mm
m (3/4 in.) dia
e) Ge
eneral purpos
wr
renches, sock
wr
renches, wire
clo
oth.
f)
Th
hread sealing
ste
eel and light m
Parts and
inside
shipping con
individ
ual packages
and sk
kids for attach
4.5.1.3
3
Uncrating
pump
a) Cle
ean the parts
oth
her foreign ma
b) Flu
ush the pump
wa
ater. Clean al
c) Re
emove any rus
su
rfaces with fin
d) Cle
ean all thread
eq
quipment.
MPS ENGLIS
SH 71569224
d Assembly
y
plied separat
tely from the p
ty of the insta
aller to ensure
bled to the pu
ump and align
4.5. Discharg
ge head colum
p assembly a
are supplied e
ly assembled
d depending u
ght. If the part
ts are shippe
customer's re
esponsibility t
with driver to
o the satisfact
ation instructio
ons.
n of pumps t
that are ship
bled
in section 2.3
3.
ent and tools
s required for
on of unasse
embled pump
vers the princ
cipal tools/item
tion.
cranes capab
ble of hoisting
mp and/or mo
otor.
amps of suita
ble size.
chain tongs &
& cable sling fo
pump and m
otor lifting eye
ifting bowl ass
sembly and th
Approximately
4.5 m (15 ft) o
ameter rope m
may be require
se hand tools,
pipe wrenche
ket set, screwd
drivers, Allen
brush, scrape
er and fine em
compound de
esigned for sta
machinery oil.
d accessories
may be place
tainers or atta
ached to skid
s. Inspect all
containers, c
hed parts befo
ore discarding
g and cleanin
ing of unasse
of any dirt, pa
acking materia
atter.
p inside and ou
utside with cle
ll machined su
urfaces.
st spots found
d on the mach
ne emery cloth
h.
ded connectio
ns and any ac
flowse
4 – 02-15
pumps.
e that
ned as
mn
either
upon the
d
to install
tion of
ped
r
ps
ms
and
for
es.
he
of 19
ed.
es, end
mery
ainless
ed
s in
crates
g.
embled
al and
ean
hined
ccessory
erve.com

Hide quick links:

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the VTP and is the answer not in the manual?

This manual is also suitable for:

Vpc

Table of Contents

Save PDF