Grouting - Flowserve VTP User Instructions

Table of Contents

Advertisement

VERTICA
Examp
ple of pump m
mounted on a
4.3.3
Leve
eling of pum
mps with the s
The suction
barrel [315] is
and aligned
with the anch
hor bolts. The
flange is leve
eled by using
precision ma
achinist's leve
el. Levels sho
the equipme
ent mounting s
flange moun
ting surface n
0.16 mm/m (
(0.002 in./ft) u
the grout to s
set for at leas
st 72~80 hour
pump is insta
alled. Rechec
surface leve
lness after the
proceed with
h the pump in
assembly [10
01] into the ba
discharge he
ead flange bo
olt holes to the
[372].
Check to ma
ake sure that t
respect to th
e barrel flang
ge to within 0.
(0.002 in./ft)
and final torq
que the nuts [
leveling data
a is to be reco
orded for futur
Example of a
a pump install
Page 23 of 7
76
AL TURBINE
E PUMPS (VT
soleplate
suction barre
s first lowered
d into the pit
suction barre
a master lev
el or a
uld be taken o
surfaces. The
e suction barre
needs to be le
eveled to with
using shims a
and grout. Allo
rs before the
ck the barrel m
mounting
e grout is set
and then
stallation. Low
wer the pump
arrel and alig
n the
e flange bolts
the pump is s
still level with
16 mm/m
373]. The
re reference.
ed with a suc
tion barrel.
TPS) CENTRI
IFUGAL PUM
4.3.4
Leveling o
mounted o
The so
oleplate [23] is
and ali
igned with the
suction
n barrel [315]
anchor
r bolts. Torqu
solepla
ate. The suct
using a
a master leve
Levels
s should be ta
surface
es. The suctio
needs
to be leveled
in./ft) u
using shims
Allow t
the grout to s
the pu
mp is installe
surface
e levelness a
procee
ed with the pu
assem
mbly [101] into
el
discha
arge head flan
[372].
 
el
Chec
ck to make su
resp
pect to the ba
on
(0.0
002 in./ft) and
el
leveli
ing data is to
hin
ow
Exam
mple of pump w
p
4.4

Grouting

G
Where
e applicable, g
After a
adding pipe w
the cou
upling alignm
should
d then be grou
engine
eering practice
Flowse
erve service c
MPS ENGLIS
SH 71569224
of pumps with
h suction ba
on a soleplat
te
s first lowered
d onto the fou
e anchor bolts
s. Then, lowe
into the pit a
nd aligned wi
ue nuts to sec
cure suction b
tion barrel fla
nge is leveled
el or a precisio
on machinist's
aken on the eq
quipment mo
on barrel flan
ge mounting
d to within 0.1
6 mm/m (0.0
s and grout u
under the sol
et for at least
t 72~80 hours
ed. Recheck th
he barrel mou
after the grout
t is set and th
ump installatio
on. Lower the
o the barrel an
nd align the
nge bolt holes
s to the flange
ure that the pu
ump is still lev
arrel flange to
within 0.16 m
d final torque
the nuts [373
be recorded
for future refe
with a suction
barrel mount
soleplate
grout in the fo
oundation bolt
work connectio
ons and re-ch
ment, the mou
nting plate/so
uted in accord
dance with go
e. If in any d
oubt, please
center for adv
vice.
flowse
4 – 02-15
arrel
undation
er
ith the
barrel to
d by
s level.
unting
surface
002
leplate.
s before
unting
en
e pump
e bolts
vel with
mm/m
3]. The
erence.
ted on a
ts.
hecking
oleplate
ood
contact
erve.com

Hide quick links:

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the VTP and is the answer not in the manual?

Subscribe to Our Youtube Channel

This manual is also suitable for:

Vpc

Table of Contents

Save PDF