Figure 39: Removing The Shipping Partition - Allied Telesis AT-x950-28XSQ Installation Manual

Virtual chassis stacking. advanced layer 3+ switch
Hide thumbs Also See for AT-x950-28XSQ:
Table of Contents

Advertisement

Chapter 3: Beginning the Installation
Figure 39. Removing the Shipping Partition
3. Lift the switch from the shipping box and place it on a level, secure
table. Refer to Figure 40 on page 73.
Warning
The switch is heavy. Ask for assistance lifting the device out of the
shipping box. You might injure yourself or damage the device if you
lift it without assistance.
72

Advertisement

Table of Contents
loading

Table of Contents