USC LPX Operator's Manual page 17

Automated seed treater
Hide thumbs Also See for LPX:
Table of Contents

Advertisement

17. Have a certified electrician provide
power to the seed treating system.
Provide convenient shutdown switches,
comply with local electrical codes and
ensure that the system is properly
grounded and bonded. The USC
system must be connected to the same
electrical requirements as specified in
the main control panel on the power
requirement tag, or the electrical
schematic shipped with the piece of
equipment. This will power the USC
LPX seed treater and any attached
conveyors.
Flexible conduit is
recommended for
main power supply.
18. A service port located on the side of the
main control panel will allow the operator
to connect a printer and an Ethernet
connection to the unit. The USB
connection will allow the user to print
reports directly from the reports screen.
19. Attach the communication cable from the pump stand control panel to the bottom
of the automated control panel (for an automated pump stand) or to the auxiliary
connection plug on the bottom of the treater control panel (for a manual pump
stand).
20. Provide 110V single phase power to both the main control panel and the pump
stand(s).
LPX AUTOMATED SEED TREATER
TREATER SET - UP
USB
Connection
Ethernet
Connection
Page 17

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents