The following steps outline the initial set-up of your USC Seed Treating system:
1. Clear the area of bystanders, especially small children, before moving.
2. Be sure there is enough clearance from overhead obstructions and power lines or
other equipment to move the machine into its working position.
3. Using a forklift, place the seed treater in the desired position on a level surface.
USC highly recommends that the seed treater be set up inside a
building or any covered structure to protect the machine from
weathering.
4. Remove any boxes and cords from the drum of the treater.
5. Install the four provided legs and set up on a level surface, preferably concrete.
When all four legs are mounted in the same pin hole, the seed treater has a slight
slope to allow seed to travel through the machine. The pin holes are approximately
2" apart.
If more slope is desired, the rear legs can be dropped an additional
pin hole.
6. Anchor the seed treater in position to prevent the machine from moving during
operation.
7. Inspect machine thoroughly for screws, bolts, fittings, etc. which may have come
loose during shipping.
8. The pump stand(s) should be placed on level ground close to the seed treater.
9. Attach the chemical tubing
from the pump stand(s) to the
atomizer plumbing on the seed
treater (right). Additional tubing
can be added or removed to
accommodate your set-up.
LPX AUTOMATED SEED TREATER
TREATER SET - UP
Page 13