TOHATSU MD 40B2 Owner's Manual page 42

Hide thumbs Also See for MD 40B2:
Table of Contents

Advertisement

42
PRE-OPERATING PREPARATIONS
Remedy
1.
Reduce the throttle to less than half
opening, and move to safe place
quickly, and stop the engine.
Check the propeller for bent or dam-
aged blades.
Consult an authorize d de aler if
engine shows the same result even
after replacing propeller with new
one.
2.
Move to safe place quickly, and stop
the engine.
Check the engine oil level, and add
engine oil if necessary.
3.
Move to safe place quickly, and check
6
the discharge of cooling water from the
water check port at idle speed and
stop engine.
Remove any foreign matter on the gear
case and propeller if necessary. Con-
sult an authorized dealer if no dis-
charge of cooling water.
4.
Charge or replace the battery.
5.
Consult an authorized dealer.
ENOW00025-A
Low speed ESG ON: Engine speed will be
limited to 3000 min
should not continue to run engine.
High speed ESG ON: Engine speed will be
limited to 6000 min
will run rough until throttle is reduced.
CAUTION
-1
(rpm), however you
-1
(rpm) and engine

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Md 90c2Md 115a2Md 30b2Md 75c2Md 50b2

Table of Contents