Program 121: Initial Operation Nicd Battery Hawker - Nortec UL60 Operation Manual

Battery charger /analyzer. 0.5 - 40vdc / 0.5 - 60a
Table of Contents

Advertisement

9 Tabular overview of the program procedures
9.2.5

Program 121: Initial operation NiCd battery HAWKER

Name according to manual: Commissioning charge (8 h)
This program also can be performed for maintenance charge (7 h).
21: NiCd battery HAWKER
select Batteryprocessing:
P1: Initial commissioning
Enter:
Number of cells
Rated capacity
Charging time span (set value: 8 hours)
Step 1:
Charging with C
for 8 hours or the time given in (eg. maintenance charge 7 h).
5
In case no automatic cell tester is connected:
15 minutes before the end of the charging a signal asks for the measurement of the single cells volt-
ages and to control the electrolyte level.
Otherwise:
15 minutes before the end of the charging you are requested to control the electrolyte level.
End of program
After the end of the program the battery needs to cool down to room temperature. Subsequent pro-
ceed with program Capacity Test 321 or Maintenance 421 according to Hawker instructions.
Voltage monitoring:
Monitoring minus ΔU > 30mV/cell during charging, error message:
minus delta U detected
62
Initial commissioning
© Nortec Electronics 2018

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents