Software Tools; Power Source; Location And Mounting Requirements; Installing The Patton Smartnode Voip Gateway - Patton SmartNode SN4170 User Manual

E1/t1 pri voip gateway
Table of Contents

Advertisement

SmartNode 4170 User Manual
IP addresses and/or URL of SIP servers or Internet telephony services (if used)
Login and password for PPPoE Accesss
Login and Password for SIP based telephony services
IP addresses of central TFTP server used for configuration upload and download (optional)

Software tools

You will need a PC (or equivalent) with Windows Telnet or a program such as Tera Term Pro or Putty to con-
figure the software on your SmartNode gateway.
Also you may use your WEB browser to configure the unit. The Web wizard in this case reduces time to get
your unit up and running. See more details on the

Power source

If you suspect that your AC power is not reliable, for example if room lights flicker often or there is machinery
with large motors nearby, have a qualified professional test the power. Patton recommends that you include an
uninterruptible power supply (UPS) in the installation to ensure that VoIP service is not impaired if the power
fails.

Location and mounting requirements

The SmartNode gateway is intended to be placed on a desktop or similar sturdy, flat surface that offers easy
access to cables. Allow sufficient space at the rear of the chassis for cable connections. Additionally, you should
consider the need to access the unit for future upgrades and maintenance.

Installing the Patton SmartNode VoIP Gateway

SmartNode Gateway installation consists of the following:
Placing the device at the desired installation location (see section
Installing the interface and power cables (see section
When you finish installing the SmartNode, go to Chapter 4,

Placing the SmartNode

Place the SmartNode on a desktop or similar sturdy, flat surface that offers easy access to the cables. The Smart-
Node should be installed in a dry environment with sufficient space to allow air circulation for cooling. In
order to prevent overheating and damaging the unit, proper ventilation is required when stacking the device.
CAUTION

Installing the Patton SmartNode VoIP Gateway

Web
To prevent overheating and damaging the unit, proper ventilation
is required when placing the device; leave at least 2 inches (5
cm) to the left, right, front, and rear of the SmartNode device.
The device should be installed in a dry environment with suffi-
cient space to allow air circulation for cooling. Do not stack multi-
ple SmartNode devices directly on top of one another, and do not
place items on top of the device. If you will be installing equip-
ment above the SmartNode device, leave at least 2 inches (5
cm) of clearance between the devices.
Wizard.

"Placing the SmartNode"

"Installing cables"
on page 25)
"Initial Configuration"
3 • SmartNode Installation
on page 24)
on page 27.
24

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents