Software Tools; Ac Power Mains; Location And Mounting Requirements; Installing The Gateway - Patton SmartNode 4970A Series User Manual

Multi-port t1/e1/pri voip gateway
Table of Contents

Advertisement

SmartNode 4970A User Manual
IP addresses of central TFTP server used for configuration upload and download (optional)

Software tools

You will need a PC (or equivalent) with Windows Telnet or a program such as Tera Term Pro Web to configure
the software on your SmartNode router.

AC Power Mains

If you suspect that your AC power is not reliable, for example if room lights flicker often or there is machinery
with large motors nearby, have a qualified professional test the power. Patton recommends that you include an
uninterruptible power supply (UPS) in the installation to ensure that VoIP service is not impaired if the
power fails. Refer to
"Connecting the power supply"

Location and mounting requirements

The SmartNode router is intended to be placed on a desktop or similar sturdy, flat surface that offers easy
access to the cables. Allow sufficient space at the rear of the chassis for cable connections. Additionally, you
should consider the need to access the unit for future upgrades and maintenance.
Under the rack mount option, the chassis can be equipped with rack mount
Note
ears that allow for use in a 19" rack.

Installing the gateway

SmartNode hardware installation consists of the following:
Placing the device at the desired installation location (see section
Connecting the interface and power cables (see section
When you finish installing the SmartNode, go to chapter 4,

Placing the SmartNode

Place the unit on a desktop or similar sturdy, flat surface that offers easy access to the cables. The unit should be
installed in a dry environment with sufficient space to allow air circulation for cooling.
For proper ventilation, leave at least 2 inches (5 cm) to the left, right, front,
Note
and rear of the unit.

Installing cables

WARNING

Installing the gateway

Do not work on the system or connect or disconnect
cables during periods of lightning activity.
on page 24.

"Placing the SmartNode"

"Installing
cables")
"Initial configuration"
3 • SmartNode installation
on page 22)
on page 25.
22

Advertisement

Table of Contents
loading

Table of Contents