Software Tools; Power Source; Location And Mounting Requirements; Installing The Smartnode Device - Patton SmartNode SN5550 User Manual

Enterprise session border controller, integrated access device, and voip gateway
Table of Contents

Advertisement

SmartNode 5550 & 4150 Series User Manual
IP addresses and/or URL of SIP servers or Internet telephony services (if used)
Login and password for PPPoE Access
Login and Password for SIP based telephony services
IP addresses of central TFTP server used for configuration upload and download (optional)

Software tools

You will need a PC (or equivalent) with Windows Telnet or a program such as Tera Term Pro or Putty to con-
figure the software on your SmartNode device. Also you may use your web browser to configure the unit. The
WebWizard in this case reduces time to get your unit up and running. See more details on
wizard.

Power source

If you suspect that your AC power is not reliable, for example if room lights flicker often or there is machinery
with large motors nearby, have a qualified professional test the power. Patton recommends that you include an
uninterruptible power supply (UPS) in the installation to ensure that VoIP service is not impaired if the power
fails.

Location and mounting requirements

The SmartNode device is intended to be placed on a desktop or similar sturdy, flat surface that offers easy
access to cables. Allow sufficient space at the rear of the chassis for cable connections. Additionally, you should
consider the need to access the unit for future upgrades and maintenance.

Installing the SmartNode device

SmartNode device installation consists of the following:
Placing the device at the desired installation location (see section
page 32)
Installing the interface and power cables (see section
When you finish installing the SmartNode device, go to Chapter 4,

Placing the SmartNode device

Place the SmartNode device on a desktop or similar sturdy, flat surface that offers easy access to the cables. The
device should be installed in a dry environment with sufficient space to allow air circulation for cooling. In
order to prevent overheating and damaging the unit, proper ventilation is required when stacking the device.
Do not stack multiple SmartNode devices directly on top of one another, and do
not place items on top of the device. If you will be installing equipment above the
SmartNode device, leave at least 2 inches (5 cm) of clearance between the
CAUTION
devices. Further more leave at least 2 inches (5 cm) to the left, right, front, and
rear of the SmartNode device for proper ventilation.

Installing the SmartNode device

"Placing the SmartNode device"

"Connecting cables"
on page 33)
"Initial Configuration"
3 • SmartNode Installation
www.patton.com/
on
on page 38.
32

Advertisement

Table of Contents
loading

This manual is also suitable for:

Smartnode sn4150

Table of Contents