Physical Installation; Required Tools And Materials For Installation - ShoreTel 4500 Installation Manual

Vpn concentrator
Table of Contents

Advertisement

Physical Installation

Component
A
B
C
1.5
Physical Installation
The VPN Concentrator is designed for desktop, rack or wall-mount (4500/4550)
installation. Observe the following guidelines when installing the system:
Never assume that the AC cord is disconnected from a power source. Always check
first.
Never place objects greater than 5 lbs on top of the appliance as damage to the
chassis may result.
Always connect the AC power cord to a properly grounded AC outlet to avoid
damage to the system or injury.
Ensure that the physical location of the installation has adequate air circulation and
meets the minimum operating conditions as provided in the environmental
specifications for the system.
1.5.1

Required Tools and Materials for Installation

A computer with Microsoft Internet Explorer.
Ethernet cables to connect the LAN ports to LAN switches or other Ethernet
devices and the WAN port to a firewall or an upstream router.
If the unit will be mounted on the wall (4500 and 4550):
— 1 Flat or Philips screw driver
— 2 round or flat head wood screws, Philips or slotted, and 1 ½ inch long. Refer
to
8
Figure 1-6 Back Panel (5300LF2)
Description
Power Inlet– Accepts a 3-pin Shroud Female connector of
a power cord with 3-pin Shroud Male connector on the
other end to connect to an AC outlet (See
ifications).
Power Switch – Turns the system power on or off.
VGA Port – Not used.
Figure
1-7.
Power
for spec-
Chapter 1

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

45505300lf5300lf2

Table of Contents