Preparing The Cable Plate For Service - Oracle SPARC Enterprise M4000 Installation And Service Manual

External i/o expansion unit
Hide thumbs Also See for SPARC Enterprise M4000:
Table of Contents

Advertisement

iou#0-pci#1:iobE02EF.pcie4
iou#0-pci#1:iobE02EF.pcie5
iou#0-pci#1:iobE02EF.pcie6
iou#0-pci#2
iou#0-pci#3
iou#0-pci#4
The next example shows the command that powers down (disconnects) the link,
followed by a command that displays the results.
# cfgadm -c disconnect iou#0-pci#1
# cfgadm
iou#0-pci#0
iou#0-pci#1
iou#0-pci#2
iou#0-pci#3
iou#0-pci#4
Note that iou#0-pci#1 is disconnected, and the six slots in the I/O boat have
disappeared.
4.5

Preparing the Cable Plate for Service

On the cable management unit, raise the cable plate (
provide easier removal of a PCI carrier or I/O boat.
1. Use an antistatic strap for this procedure.
2. Loosen two cable plate locking screws (item 3 in
3. Pull the cable plate toward you approximately 0.5 in./13 mm, then raise it
approximately 0.75 in./20 mm, until the bottom of the plate is above the tops of
the support brackets.
4. Push the cable plate forward to its service position (
plate rests on the support brackets.
The tabs on the sides of the cable plate should lie in the small notches on the tops
of the support brackets.
unknown
empty
fibre/hp
connected
unknown
empty
unknown
empty
etherne/hp
connected
pci-pci/hp
connected
scsi/hp
connected
unknown
disconnected unconfigured unknown
unknown
empty
etherne/hp
connected
pci-pci/hp
connected
Chapter 4
unconfigured unknown
configured
unconfigured unknown
unconfigured unknown
configured
configured
configured
unconfigured unknown
configured
configured
or
FIGURE 4-2
FIGURE 4-3
).
FIGURE 4-4
) so that the cable
FIGURE 4-4
Servicing and Replacing Components
ok
ok
ok
ok
ok
ok
) to
4-7

Advertisement

Table of Contents
loading

Table of Contents