More On Multi-Ramp/Soak Programming - Newport Pt32 Operator's Manual

Temperature, process and strain controllers, platinum series
Table of Contents

Advertisement

Reference Section: Programming Mode (PRoG)
60
PLATINUM Series Controllers User's Guide

7.7.8 More on Multi-Ramp/Soak Programming

7.7.8.1 Overview
A key feature of the Ramp and Soak mechanism is provided by the ability to 'link' ramp/soak segments
together to create a chain of sequences. This allows sequences of up to 792 Ramp/Soak pairs to be
defined. A Ramp/Soak segment is defined as a specified increase or decrease (Ramp) of the process
variable over a set period of time, followed by holding (Soak) the process variable at a fixed level for a
fixed period of time.
Figure 14. Ramp & Soak Process Variable Period of Time.

Advertisement

Table of Contents
loading

This manual is also suitable for:

Pt16Pt8dPt16dPt8ePt8pt

Table of Contents