Performing The System Function Test; Completing The Operational Qualification; Plumbing The Eg For Analytical Ic Applications - Thermo Scientific Dionex ICS-5000+ Installation Instructions Manual

Ion chromatography system
Table of Contents

Advertisement

If you are installing an ED, set up the eluent generator (see
NOTE
Section
forming the system function test. The test for an ED requires
KOH eluent. The test for a CD requires only deionized water.
4.2.5

Performing the System Function Test

Complete the system function test to verify that the basic system components
(injection valve, pump, and detector) are functioning correctly. For
instructions, refer to Dionex ICS-5000
(Document No. 065402), provided in the DC Ship Kit (P/N 072011, standard
DC; P/N 22171-62000, low-temperature DC).
4.2.6

Completing the Operational Qualification

If you purchased the Operational Qualification (OQ) option, complete the
procedure now for a CD system. For an ED system, complete the OQ after
plumbing the EG.
4.2.7

Plumbing the EG for Analytical IC Applications

Refer to the Dionex EGC and CR-TC manuals for the optimal operating
conditions for your application. The manuals are provided on the Thermo
Scientific Reference Library DVD (P/N 053891).
The Dionex EGC-CO
NOTE
EPM Electrolytic pH Modifier require specialized procedures
for installation and conditioning. For details, refer to the
product manuals. The manuals are provided on the Thermo
Scientific Reference Library DVD (P/N 053891).
For an illustration of the liquid flow path through the EG components after all
conditioning and plumbing connections are complete, see
standard-pressure analytical systems) or
analytical systems).
Some RFIC systems require a backpressure coil. If the sys-
NOTE
tem pressure is below 14 MPa (2000 psi) at system equilibra-
tion (see
Doc. 065447-02 12/14
4.2.5) before completing the IQ checklist and per-
EGC and Thermo Scientific Dionex
3
Section
4.4), install a backpressure coil between the
4 • System Plumbing
+
System Installation Qualification
Figure 4-21
Figure 4-22
(for high-pressure
(for
99

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents