Connecting High-Pressure Tube Fittings - Thermo Scientific Dionex ICS-5000+ Installation Instructions Manual

Ion chromatography system
Table of Contents

Advertisement

+
Dionex ICS-5000
Installation Instructions
substitute different tubing. This tubing is precision cut at the factory,
using a specialized cutter. Precision cut tubing is included in the Dionex
IC Cube Tubing Kit (P/N 072186).
1.6.1

Connecting High-Pressure Tube Fittings

1. Install the fitting bolt and ferrule onto the tubing. Position the ferrule at
least 2 mm (0.1 in) from the end of the tubing (see
Correct placement of ferrule
and fitting on tubing
Figure 1-2. Ferrule and Fitting Bolt Placement for Tubing Connections
2. Insert the tubing into the port until it stops.
Figure 1-3. Ferrule and Fitting Bolt Placement for Tubing Connections
3. While maintaining pressure on the tubing to keep it in place in the port,
tighten the fitting bolt fingertight and then tighten the fitting further by
following the instructions in
10
Incorrect placement of ferrule
and fitting on tubing
Section
1.6.2.
Figure
1-2).
Doc. 065447-02 12/14

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents