Vertiv MPH2 Installer/User Manual page 44

Rack pdu
Hide thumbs Also See for MPH2:
Table of Contents

Advertisement

Length in (mm)
Safety Standards (vary by model
and region)
EMC Standards (vary by region)
Agency Approvals (vary by model
and region)
Vertiv | Vertiv™ MPH2 Rack PDU Installer/User Guide
0U
13.1 - 72.2 (333-1833)
IEC 60950-1:2006/A2:2013 (second edition + amendment2:2013)
CSA 22.2 No. 60950-1-07 (second edition) + amendment 1:2011-2012
UL 60950-1 (second edition, 2011-12-19)
IECEE CB Full Certificate Scheme (IEC 60950-1:2005(ed.2) +A1:2009 +A2:2013)
FCC Class A, Part 15, Industrial
EN55022:2006+A1:2007, Class A, Industrial
EN55024:1998+A1:2001+A2:2003, Class A, Industrial
IEC61000-3-2:2014 (edition 3), IEC61000-3-3:2013 (edition 3)
IEC61000-4-2/3/4/5/6/8/11
Note: A temporary loss of touch-key functionality may occur for sufficiently large radio-frequency fields induced
through the input power-supply cord.
UL, cUL, CE, BV, CB, RoHS, REACH, WEEE
1U
19 (483)
2U
40

Advertisement

Table of Contents
loading

Table of Contents