10. Slide the conduit into the conduit connector.
11. Tighten the conduit connector until it grips the conduit and crimps it securely. See the
conduit connector manufacturer's installation instructions for recommended locknut
tightening torque values.
Figure 3.2 Re-assembly to install an input power cable in conduit
Figure 3.3
NUMBER
DESCRIPTION
1
Terminal block cover
2
Filler cover
3
Terminal block screws
4
Terminal block
Table 3.1
Hard-wired models—Recommended Wiring Sizes
UNITS
Metric
Imperial (US Standard)
Vertiv | Vertiv™ MPH2 Rack PDU Installer/User Guide
NUMBER
DESCRIPTION
5
Terminal block labels
6
Metal end plate (attached with 4 screws)
7
Conduit connector (field-supplied) and locknut
8
Conduit (cable not shown)
MPH2™ RACK PDU INPUT CURRENT RATING
≤32 A
4 mm²
10 AWG
>32 A
²
10 mm
6 AWG
15