Attaching Input-Power Cords With Conduit - Vertiv MPH2 Installer/User Manual

Rack pdu
Hide thumbs Also See for MPH2:
Table of Contents

Advertisement

Figure 3.1 Disassembly to install an input-power cable
NUMBER
1
Terminal block cover
2
Terminal-block screws
3
Terminal block

3.1.2 Attaching Input-power Cords with Conduit

1.
Remove the end cap. It is held in place with two T10 Torx screws.
2. Remove the terminal block cover.
3. Loosen the strain-relief collar. It is held in place with four nuts (see
input-power cable
4. Remove a section of the outer jacket and strip the insulation from the individual wires as
required to fit into the terminal block.
Recommended stripping length for MPH2™ Rack PDU units rated less than 32 A is 9 mm; for
MPH2™ Rack PDUs rated at 40 A or higher, a strip length of 11 mm is recommended.
5. Slip the stripped wire through the conduit connector, through the metal end plate, through
the locknut and into the terminal block cavity.
6. Loosen the terminal block screws.
7. Insert the wires into the terminal block according to the labeling inside the MPH2™ Rack PDU;
tighten each terminal block screw after inserting a wire. Refer to
page 16 for tightening torque.
8. Install the terminal block cover, by either sliding it on or snapping it into place and sliding it
firmly against the main body of the MPH2™ Rack PDU.
9. Attach the metal end plate to the MPH2™ Rack PDU with four screws provided in the kit.
Vertiv | Vertiv™ MPH2 Rack PDU Installer/User Guide
DESCRIPTION
on page 14).
NUMBER
DESCRIPTION
4
Terminal-block labels
5
Strain-relief collar w/Phillips-head screws
6
End cap (attached with 2 screws)
Disassembly to install an
Terminal tightening torque
on
14