Putting Into Operation; Safety Instructions; Putting Into Operation For The First Time; Running-In Period - Wacker Neuson 1001 Operator's Manual

Dumper
Hide thumbs Also See for 1001:
Table of Contents

Advertisement

3.6

Putting into operation

Safety instructions

Putting into operation for the first time

Running-in period

BA 1001/1501/2001 us – Edition 3.3 * 12001b320.fm
• Use footholds and handles to access and leave the machine
• Never use control elements as handles
• Never get on a moving machine. Never jump off the machine
Important information
• The machine may only be put into operation by authorized personnel
Selection and qualification of personnel, basic responsibilities on page 2-4 and
see chapter 2.5
Safety instructions regarding operation on page 2-5 of this
Operator's Manual.
• The personnel must have read and understood this Operator's Manual before putting
the machine into operation.
• The machine may only be used in technically perfect condition in accordance with its desig-
nated use and the instructions set forth in the Operator's Manual, and only by safety-
conscious persons who are fully aware of the risks involved in operating the machine.
• Go through the "Start-up" checklist in the following chapter.
Handle the machine carefully during its first 50 operating hours.
The future performance and service life of the machine are heavily dependent on the
observance of the following recommendations during the running-in period.
• Do not overload the machine, but at the same time do not travel too cautiously either,
as the machine will never reach its proper operating temperature
• Do not run the engine at high speed for extended periods
• Increase the load gradually while varying the engine speed
• Strictly observe the maintenance schedules in the appendix
– see chapter 5.16
Maintenance plan 2001 (overview) on page 5-39
Operation
– see chapter
3-9

Advertisement

Table of Contents
loading

This manual is also suitable for:

15012001

Table of Contents