Removing The Transport Package; Moving The Unpacked Drive Cabinet; Lifting The Drive Cabinet With A Crane - ABB ACS880-07 Hardware Manual

45 to 710 kw, 50 to 700 hp
Hide thumbs Also See for ACS880-07:
Table of Contents

Advertisement

64 Mechanical installation

Removing the transport package

Remove the transport package as follows:
1. Undo the screws that attach the wooden parts of the transport crate to each other.
2. Remove the wooden parts.
3. Remove the clamps with which the drive cabinet is mounted onto the transport pallet
by undoing the fastening screws.
4. Remove the plastic wrapping.

Moving the unpacked drive cabinet

Lifting the drive cabinet with a crane

Lift the drive cabinet using its lifting eyes. The lifting eyes can be removed after the cabinet
is in its final position, but their mounting holes must be blocked to retain the degree of
protection.
Note: The minimum allowed height of the lifting slings with IP54 units is 2 meters (6'7").
Max. 30°
IP22/IP42
UL Type 1/UL Type 1 Filtered
IP54
UL Type 12

Advertisement

Table of Contents
loading

Table of Contents