Task
Unpack and check the units (only intact units may be started up).
Make sure that all necessary option modules and equipment are
present and correct.
Install the drive mechanically.
Route the cables.
Check the insulation of the supply cable, the motor and the motor
cable.
If the drive is about to be connected to an IT (ungrounded) system,
check that the drive is not equipped with EMC filter +E200 or +E202.
Connect the power cables.
Connect the control cables.
Check the installation.
Start the drive up.
Operate the drive: start, stop, speed control etc.
Introduction to the manual 25
See
Mechanical installation
(page 61)
Routing the cables
(page 89)
Checking the insulation of the
assembly
(page 99)
Checking the compatibility with IT
(ungrounded) and corner-grounded
delta systems (frames R6 to R9)
(page 101)
Connecting the power cables
107),
Connecting the control cables
(page 117),
Installation checklist
(page 153)
If the drive has been non-
operational for more than one year,
reform the DC link capacitors. See
Converter module capacitor
reforming instructions
(3BFE64059629 [English].
Start-up
(page 155)
ACS880 quick start-up guide,
firmware manual
(page