Contents Of This Chapter - ABB ACS880-07 Hardware Manual

45 to 710 kw, 50 to 700 hp
Hide thumbs Also See for ACS880-07:
Table of Contents

Advertisement

Installation checklist

Contents of this chapter

This chapter contains an installation checklist which you must complete before you start up
the drive.
Warnings
WARNING! Obey the instructions in chapter
them, injury or death, or damage to the equipment can occur. Do the steps in
section
Precautions before electrical work
Go through the checklist together with another person.
Checklist
Check that ...
The ambient operating conditions meet the specifications given in chapter
The drive cabinet has been fixed to floor, and if necessary due to vibration etc, also from top to the
wall or roof.
The cooling air will flow freely in and out of the drive cabinet,
If the drive will be connected to an IT (ungrounded) or a corner-grounded TN network: The optional
EMC filter (+E200, +E202) of the drive (if any) has been disconnected. See the electrical installation
instructions (page 101).
If the drive has been stored over one year: The electrolytic DC capacitors in the DC link of the drive
have been reformed. See Converter module capacitor reforming instructions (3BFE64059629
[English]).
Installation checklist 153
9
Safety
instructions. If you ignore
on page
18
before you start the work.
Technical
data.

Advertisement

Table of Contents
loading

Table of Contents