7705 SAR-A Chassis Installation Guide
Table 12: Specific Characteristics of the Installation Site (Continued)
Characteristic
•
Is the rating and capacity adequate for the space?
•
Is there proper drainage of water from the dehumidifier?
Is backup power generation located in a separate area from the
communications equipment?
Are batteries located in a separate area from the communications
equipment?
Is the equipment located above the water grade?
Are there adequate water drainage and leak controls?
Is there protection present to prevent entry of insects, pests, and
vermin?
Site Preparation
Yes
No
65