Power Supply; Installation Tools; Unpacking The Access Point - Ruijie RG-AP740-I Series Hardware Installation And Reference Manual

Hide thumbs Also See for RG-AP740-I Series:
Table of Contents

Advertisement

Hardware Installation and Reference Guide
Gas
SO
2
H
S
2
NO
2
NH
3
Cl
2

2.7 Power Supply

DC power adapter: 42.5VDC to 57VDC (input voltage), 0.7A (minimum current), 30W (minimum power)
PoE injector: IEEE 802.3af/802.3at compliant
The DC input power should be greater than the power actually consumed by the system. The input power for the
RG-AP740-I should not be lower than 25.4W.
Please use Ruijie certified PoE injectors.

2.8 Installation Tools

Phillips (crosshead) screwdriver, related copper and fiber cables, bolts, diagonal pliers, cable
Common Tools
ties
Special Tools
Wire stripper, crimping pliers, RJ-45 crimping pliers, punch down tool
Meter
Multimeter, bit error rate tester (BERT)
The tools listed above are customer supplied.

2.9 Unpacking the Access Point

Package Contents
3
Average (mg/m
)
0.2
0.006
0.04
0.05
0.01
Preparing for Installation
3
Maximum (mg/m
)
1.5
0.03
0.15
0.15
0.3
·

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the RG-AP740-I Series and is the answer not in the manual?

Questions and answers

Table of Contents