2. Measure the target point in the R direction.
"R" appears next to the "Topography observation
(Topography)"
"PROCEDURE Topography Observation" step 2
3. Record the measured data.
"PROCEDURE Topography Observation" step 3
4. Measure the target point in the L direction.
"L" appears next to the "Topography observation
(Topography)." Record the measured data after the
observation is completed.
Steps 2 to 3
5. End the topography observation.
"PROCEDURE Topography Observation" step 4
• In the screen displaying [MEAS], pressing {ENT} or the trigger key functions in the same manner as pressing
[MEAS]. Pressing the trigger key during successive measurement stops the measurement. In the
measurement record screen, pressing the trigger key functions in the same manner as pressing [OK].
• When "No" is set for "Pre-entered point registration (PreenterPt)", the point name must be entered in the
screen recording measured data.
• In the screen recording measured data, items displayed vary according to the observation setting.
19. TOPOGRAPHY OBSERVATION
Topography
ZA
HA-R
HR
PT
AUTO0011
EDM
Topography
ZA
HA-R
HR
PT
AUTO0011
EDM
85
R
D=2
8 9
5 9
5 9
0
1 0
0 0
0.000m
ANGLE
MEAS
L
D=2
2 7 0
0 0
0 0
1 8 0
1 0
0 0
0.000m
ANGLE
MEAS