Changing The Starting Point - Sokkia im-101 Operator's Manual

Im-100 series intelligence measurement station
Table of Contents

Advertisement

• When [S/%] is pressed, the distance between two points
(S) is displayed as the gradient between two points.
• Press [MEAS] to observe the starting position.
"PROCEDURE Measuring using observation"
• When [MOVE] is pressed, the last target measured
becomes the new starting position to perform missing line
measurement of the next target.

"21.2 Changing the Starting Point"

6. Press {ESC} to end missing line measurement
• Missing line measurement results cannot be recorded when point names for 1st and/or 2nd target are null.
Always input point names for both targets.
21.2 Changing the Starting Point
It is possible to change the last measured point to the next starting position.
PROCEDURE
1. Observe the starting position and target.
 "21.1 Measuring the Distance between 2 or more
Points"
2. After measuring the targets, press [MOVE].
Press [YES].
• Press [NO] to cancel measurement.
21. MISSING LINE MEASUREMENT
MLM
SD
HD
VD
MOVE
MLM
M ove 1st m eas ?
SD
ZA
HA-R
97
20.757m
27.345m
1.012m
REC
MEAS
MLM
NO
YES

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Im-102Im-105Im-103

Table of Contents