Transmitting Layer 2 Traffic; Using J-Proof To Verify Layer 2 Transparency - JDS Uniphase hst-3000 User Manual

Ethernet tester
Hide thumbs Also See for hst-3000:
Table of Contents

Advertisement

Transmitting layer 2 traffic

Using J-Proof to verify layer 2 transparency

After you configure the layer 2 settings, you are ready to
transmit traffic over the link.
To transmit traffic
1 If you haven't already done so, launch the terminate appli-
cation for the circuit you are testing (see
application" on page
Layer 2 Traffic test (see
page
46).
2 Initialize the link (see
testing" on page
3 Configure the HST for your test (see
Ethernet tests" on page
4 Press the Home button to return to the Summary Results
screen.
5 Press the Action soft key again, and then select one of
the following:
– Start Traffic (if you configured a constant, bursty, or
flooded load).
– Start Ramp (if you configured a ramped traffic load).
The HST-3000 transmits traffic over the link.
Using the J-Proof application, you can verify that an Ethernet
circuit can support a variety of control protocols (such as CDP,
VTP, STP, and RSTP), irrespective of the underlying transport
method.
When you verify layer 2 transparency, the receiving test
instrument loops back all test frames, including control frames
and frames carrying a broadcast or multicast address. To do
HST-3000 Ethernet Testing User's Guide
28), and then select the
"Selecting a layer 2 test" on
"Initializing the link for Ethernet
47).
51).
Chapter 3 Ethernet Testing

Transmitting layer 2 traffic

"Launching an
"Configuring layer 2
71

Advertisement

Table of Contents
loading

Table of Contents