JDS Uniphase hst-3000 User Manual page 86

Ethernet tester
Hide thumbs Also See for hst-3000:
Table of Contents

Advertisement

Chapter 3 Ethernet Testing
Configuring layer 2 Ethernet tests
64
Setting
Stop Load(Drop)
# Drop Frames
(If Stop Load(Drop) is Yes)
Stop Load(Pause)
# Pause Frames
(If Stop Load(Pause) is Yes)
5 If you need to specify other settings for the test, use the
left and right arrow keys to go to the appropriate configu-
ration menu; otherwise, press the Home button to return
to the Summary Results screen.
The unit is configured to transmit a ramped load of traffic.
HST-3000 Ethernet Testing User's Guide
Parameters
If you want to stop the
ramp from incrementing
when frames are dropped,
select:
– Yes
If you do not want the
ramp to stop increment-
ing, select:
– No
Enter the number of
frames that must be
dropped before the unit
stops incrementing the
ramp.
If you want to stop the
ramp from incrementing
when pause frames are
detected, select:
– Yes
If you do not want the
ramp to stop increment-
ing, select:
– No
Enter the number of
pause frames that must
be detected before the
unit stops incrementing
the ramp.

Advertisement

Table of Contents
loading

Table of Contents