2.1
BLOCK DIAGRAM
2.1.1 WIRING AND BLOCK DIAGRAMS FOR ALL FRAMES AND MODULES
The customer has to supply the wiring to connect the UPS to the local power source. The installation inspection
and initial start up of the UPS and extra battery cabinet must be carried out by a qualified service personnel
such as a licensed service engineer from the manufacturer or from an agent authorized by the manufacturer.
2.1.2 RECOMMENDED CABLE SECTIONS & FUSE RATINGS
2.1.2.1
Terminal connections overview
FRAME TYPE
Separate. Battery
Terminals (T)
(+ / N / - ) +PE
Connection Bar (B)
CLASSIC DPA-50
3+1 x 16/25mm2 (T)
TRIPLE DPA-150
9+1 x 16/25mm2 (T)
+PE 1xM10 (B)
UPGRADE DPA-250
15 x 16/25mm2 (T)
+PE 1xM12 (B)
CLASSIC DPA-50
TRIPLE DPA-150
UPGRADE DPA-250
Dual feed input
Common Battery
Input Bypass
(+ / N / - ) +PE
3+N
3+1 x 16/25mm2 (T)
4 x 16/25mm2 (T)
3 x M10 (B)
3 x M10(B)
+PE 1xM10 (B)
+PE 1xM10 (B)
3 x M12 (B)
3 x M12 (B)
+PE 1xM12 (B)
+PE 1xM12 (B)
Single feed input
04-3008_S2_ABB_OPMCPDPA-S2_GB_121202
Printed in Switzerland – Modifications reserved
Input Rectifier
Output load
3+N+PE
3+N+PE
5 x 16/25mm2 (T)
5 x 16/25mm2 (T)
4 x M10 (B)
4 x M10 (B)
+PE 1xM10 (B)
+PE 1xM10 (B)
4 x M12 (B)
4 x M12 (B)
+PE 1xM12 (B)
+PE 1xM12 (B)
Section-2
Page 2/16 ABB