Parallel Adapter And Dip-Switch Sw2-2; Dip-Switch Sw1-9 Settings; Dip Switch Sw1-9 - ABB CONCEPTPOWER CLASSIC DPA-50 User Manual

Conceptpower dpa series
Table of Contents

Advertisement

6.1.2.2.2

Parallel Adapter and DIP-Switch SW2-2

If the UPS-CABINETS are paralleled the Parallel Adapter will be placed on the Connector JD8 on the
distribution panel and the communications cables between the cabinets will be connected through the
connectors JD5 and JD6, as we are doing now.
NOTE: set the Switch SW2-2 correctly according to the corresponding cabinet configuration.
Parallel
Adapter
JD 5
JD6
6.1.2.3

DIP-Switch SW1-9 Settings

Before starting up the parallel system it is necessary to set the DIP Switches SW1-9 to their correct positions.
6.1.2.4

DIP Switch SW1-9

The DIP Switch SW1-9 is located on every Cabinet (CONCEPTPOWER DPA
possible to determine the "position of an CONCEPTPOWER DPA
Define each CONCEPTPOWER DPA
1. The "First",
2. The "Middle" (there may be more than one) and
3. The "Last"
Cabinet in the Multi-Cabinet Chain by setting the DIP Switch SW1-9 on each cabinet according to the Table
below:
SW1-9 Single
First
Cabinet
Cabinet
1
ON
ON OFF
2
ON
OFF
3
ON
ON OFF
4
ON
ON OFF
5
ON
ON OFF
6
ON
ON OFF
7
ON
ON OFF
8
ON
ON OFF
9
ON
ON
After having set the SW1-9 on all the CONCEPTPOWER DPA
commissioned
SW2-2
SW 1
SW 2
TM
S2 - Cabinet in a Multi-Cabinet Chain as:
Middle
Last
Cabinet
Cabinet
ON
OFF
ON
OFF
ON
ON
ON
ON
ON
OFF
ON
04-3008_S6_ABB_OPMCPDPA-S2_GB_121202
Printed in Switzerland – Modifications reserved
JD8
SingleUnit First Unit Middle Unit Last Unit
ON
OFF
ON
ON
TM
–S2 Cabinet" in a Multi-Cabinet Chain.
TM
S2 - Cabinets correctly the UPS's may be
OFF
ON
OFF
OFF
TM
S2) With this switch it is
Page 4/6 ABB
Section-6

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents