8.1 Menu selection (weight calibration / temp. calibration etc.)

8.1.1 P1 Calibration (adjustment)

As the acceleration value due to gravity is not the same at every location on earth,
each balance must be coordinated - in compliance with the underlying physical
weighing principle - to the existing acceleration due to gravity at its place of location (
only if the balance has not already been adjusted to the location in the factory). This
adjustment process must be carried out for the first commissioning, after each
change of location as well as in case of fluctuating environment temperature. It is
also recommendable to adjust the balance periodically during weighing operation in
order to obtain exact measured values.
Procedure for adjustment:
Observe stable environment conditions. A warming-up time of ca. 30 minutes for
stabilisation is necessary.
Important!
The sample plate should be put. During the adjustment process no objects should be
on the sample plate.
Operator
Call up menu item "P1 Calibration"
(see chapter 7.1)
Push
-button
01 Ext. calibr. - Adjustment with an external weight
Use the cursor (►) to select "01 Ext. calibr."
Push
-button
Ensure that there are no objects on the sample
plate.
84
Indication
29.12.04
Setup
P1
C
alibration
P2 GLP
P3 D
ate/Time
P4 Redout
P5 RS-232
P6
Printouts
P7
Globals
29.12.04
Setup
Setup