Installation Inspection - Broaster 1600 Operation Manual

Pressure fryer w/smart touch control
Hide thumbs Also See for 1600:
Table of Contents

Advertisement

Before operating unit, be sure installation
meets all requirements in the Installation
Manual provided with your unit.
Follow cleaning instruc-
tions as outlined in this
manual before operating the first time.
See section 9 - CLEANING.
• A remote circuit breaker or fuse should
be installed in the main power supply
located in a path of exit and clearly iden-
tified.
• To avoid splashing of hot liquid, unit
must be restrained to prevent tipping.
This can be done by installing the unit in
a battery of appliances, in an alcove or
with adequate ties.
• See Safety Relief Valve under GET-
TING TO KNOW YOUR BROASTER
PRESSURE FRYER. DO NOT install unit
where traffic area's are on either side or
in back of unit.

3 - INSTALLATION INSPECTION

®
broaster.com Manual #17269 8/13 rev 5/14
1800GH:
1800GH is equipped with a three-prong
(grounding) plug for your protection
against shock hazard and should be
plugged directly into a properly
grounded three-prong receptacle.
NOT
cut or remove grounding prong
from this plug.
line, should be located in a path of exit
and clearly identified.
Contact your local Broaster Company rep-
resentative for converting from one type of
gas to another.
3-1
Electrical Grounding
Instructions - The Model
A gas shutoff valve,
installed in gas supply
DO

Advertisement

Table of Contents
loading

This manual is also suitable for:

1800

Table of Contents