Switch Kit For Side-To-Side Cisco Switch For 800-Mm W Rack: E650304/E6506014/E9513014/E6513014 - Vertiv DCE E42611 User Manual

Table of Contents

Advertisement

Figure 4.13 Cover-panel installation and location of openings
ITEM
DESCRIPTION
1
Cover plate
2
#10-32 Torx screw, 4 per panel
3
Sections in EIA rail to leave open
4
Right-front EIA rail
4.11 Switch Kit for Side-to-side Cisco Switch
for 800-mm W Rack: E650304/E6506014/E9513014/E6513014
The kit provides proper air flow for a side-to-side switch. The kit options are:
E6503014: Kit for 4 RU Cisco switch
E6506014: Kit for 11 RU Cisco switch
E9513014: Kit for 14 RU Cisco switch
E6513014: Kit for 19 RU Cisco switch
To install the baffles:
1.
Make sure to orient the baffles for proper air flow as follows:
Place the left-side, exhaust baffle vertically in the rail with the closed face toward the
front, and the open face toward the back.
Place the right-side, intake baffle with the open face toward the front and the closed face
toward the back.
2. Assemble and adjust the baffles before mounting on the rail.
3. Peel the backing from the gasket, and stick it on the top and bottom flanges that make contact
with the side of the equipment.
Vertiv | DCE Installer/User Guide |
36

Advertisement

Table of Contents
loading

Table of Contents