Baying Gasket Kit: E4013 - Vertiv DCE E42611 User Manual

Table of Contents

Advertisement

4.12 Baying Gasket Kit: E4013

NOTE: The kit is for 24-in. wide spacing only.
When baying racks together on 24-in. centers, use a Baying Gasket Kit to seal the gap between the racks
to maintain proper hot-aisle/cold-aisle best practices. The gasket must be installed before baying racks.
To install the gasket:
1.
Measure and cut gasket to length.
2. peel adhesive backing from the gasket, and place the gasket around side perimeter of one of
the racks.
3. Position the racks next to each other with the gasket between them.
The racks are ready for baying.
Figure 4.15 Baying gasket location
Vertiv | DCE Installer/User Guide |
38

Advertisement

Table of Contents
loading

Table of Contents