4.9 Vertical-airflow Baffle with Brush Kit and Vertical Cable Manager
The brush grommet rail kit and vertical cable manager can be installed together. To install the cable
manager, the EIA rails must be recessed a total of 4.75 in. from the front of the rack. When installing both
options, place a vertical cable manager on top of the mounting plate of the vertical airflow baffle; align with
the AMH. Insert a tool-less rivet through both the vertical cable manager and mounting plate.
Figure 4.9 Installing a baffle and cable manager together
ITEM
DESCRIPTION
1
Tool-less rivets for 1/4-in. push holes
2
AMH along EIA rail
3
Vertical brush-mounting plate